
21. KEY PAD MEMBRANE REPLACEMENT
This procedure provides instructions for replacing
the key pad membrane.
1. Remove the front panel assembly as directed
in section 18.
2. Remove the key pad PCB as directed in sec
-
tion 20.
3. Remove the keypad membrane by gently
pulling the membrane up and out of the
holes in the front panel.
4. Reverse the above steps to install the re-
placement membrane.
22. MAIN PCB ASSEMBLY REPLACEMENT
This procedure provides instructions for replacing
the main PCB assembly with the connector panel at
-
tached. The assembly consist of two PCBs (Control
and Spectrum Analyzer) which must be replaced to
-
gether.
1. Remove the front panel assembly as directed
in section 18.
2. Disconnect the battery connector from J13 on
the main PCB.
3. Disconnect the semi-rigid coaxial cable from
the RF In connector on the connector panel.
4. Remove the three PCB mounting screws and
remove the Control PCB assembly with the
connector panel attached.
5. Remove the three .25” standoffs and four
Phillips screws and remove the Spectrum
Analyzer PCB.
6. Reverse the above steps to install the new
main PCB.
NOTE
The main PCB connector panel fits into
grooves in the two halves of the case. Make
sure the panel is correctly aligned with the
grooves before reassembling the two halves to
-
gether.
20 Site Master S114C/S332C MM
PCB MOUNTING
SCREWS (3)
BATTERY
CONNECTOR
Figure 16. Control PCB
STANDOFFS
PCB MOUNTING SCREWS
Figure 17. Spectrum Analyzer PCB
Figure 18. Front Panel Keypad Membrane
Kommentare zu diesen Handbüchern